Lexington, KY (May 27th, 2014) – There are many common mistakes that can be easily avoided when building an equestrian arena. North America’s premier equestrian footing experts, Martin Collins USA, set out the major pitfalls that buy viagra – generic viagra but often, men use viagra, because only viagra helps to restore erection independently on hardness of disease.pills viagra represents a … can arise when either building or getting an arena built, and how to avoid them.

1. Using the wrong quantity or quality of stone

You should always be aware of the type of materials required for you build and what you are being supplied with.
For the base layer (stone drainage layer), it is VITAL that clean, hard, angular stone is used. Clean: means the stone has been washed so stone dust/fine soil is not washed straight in to your drains, causing reduced flow of surplus water. We recommend granite or a hard limestone (not soft limestone).

The stone layer should be 5” (150mm) compacted depth when laid, ideally the stone layer should extend 50cm beyond the fence/kick boards so generic prednisone side effects buy prednisone online now purchase prednisone the perimeter drain is laid outside the school.

Be cautious if your contractor does not specify the grade/quantity or depth of the materials being laid. Clearly if less stone is used, it will be cheaper and some contractors will reduce the specification and price in order to win the work.
Hard – means the stones are frost resistant, i.e. will not break down after successive winters, or fracture due to the weight of maintenance machinery. The quarry can provide ‘technical data sheets’ if in any doubt. A good test – take two stones and bang them together, they should not dust, crack or break – if they do, they are not frost resistant.
Angular stones must inter-link together, so they need to be of similar size, typically 1 3/4 to 2 3/4. (If the stone is rounded it will never “knit” together, so the surface will never be correctly compacted if the base layer moves).

2. Inadequate Drainage:

There should be at least one drain across the school and one on the perimeter, on all sides
If the ground is heavy clay, additional cross drains should be installed and the diameter of the exterior drains increased
It is important that the drain runs have a consistent fall
If the drainage runs (trenches) are up and down (like a dogs hind leg), do not lay the pipe with pea shingle (fine small pebbles, that are “hard”)

The tops of all the trenches should be covered with a fine grade (eg 4 oz) non woven jun 6, 2013 – baclofen (lioresal, gablofen) tablets are no longer available in brand -name form; only generic baclofen tablets are available. for the geotextile membrane which will allow the water to pass in to the drains, but prevent silt/sediment. Avoid purchasing unwashed sand for the equestrian surface.

3. Weak Fencing Posts

Fencing posts should always be concreted in, as they need to support the retaining boards.
This combination should be strong enough to withstand the surface being packed against them, and able to endure being struck by any maintenance machinery.

4. Building at the wrong time of year/in the wrong conditions

During a dry period preferably in the summer. Clay clomid yeast infection symptoms clomid without prescription in particular needs to be carefully managed, especially during earthworks, such as “cut and fill”, so “clay heave” does not occur. (This is most likely to occur when wet and under pressure, which causes it “bubble up”, this can move the stone layer and membranes, leading to contamination of the surface and poor drainage. Should this occur, remedial works will be required).

5. Incorrect cut and fill

Cut and Fill is the process of cutting in to a bank, and re-laying the material lower down the bank to create a “level formation” for your outdoor equine arena. The banks/slopes must be created correctly to support the new formation.

Top tips from Martin Collins:

The recommended depth of stone is 5” (150mm), especially for difficult ground, such as heavy clay.
It is important to include drainage trenches on the outside of the arena. These external drains will stop the “run off” from adjacent paddocks – so this is especially important if an arena has been cut into the slope. They are also important because the outside track typically has the heaviest “foot fall.

To receive a free 25-page buy levitra cheap online, buy cheap levitra – pill shop, fast and secure!! fda Footing Guide, please complete the contact form on the Martin Collins website.

Share

European News International News Latest Press Releases News and Top Stories North American News Top Stories

Related Posts

Post Your Comment

You must be logged in to post a comment.

Quick Links